Services
Shutdown Planning & Execution Services
Your shutdown is the single largest controllable expense on your annual maintenance budget. The number driving it should be engineered, not estimated. Most are not. We work with your team from the first planning session through the day the plant comes back on-line to ensure your shutdown is driven by the work, not inflated estimates.
Shutdown planning
A great shutdown isn’t won during execution. It’s won during planning. The difference between a shutdown that runs smoothly and one that runs long almost always comes down to the quality and depth of preparation, and how early that preparation began.
Our shutdown planning engagement typically spans 7 to 11 months and includes:
Development of the Essential Work Scope and Shutdown Objective
Contractor RFQ preparation, bid evaluation, and selection support
Construction of the full Critical Path Network in MS Project®, incorporating all area work scopes
Action Item List development and weekly tracking throughout the planning period to ensure preparation milestones are met
Integration of all contractor work into a single master shutdown network
Resource identification, scheduling, and leveling across all contractors and crafts
Safety task integration — risks identified and planned for before the shutdown begins
Pre-shutdown network review, approval, and sign-off by all contractors and in-house stakeholders
The single most important thing you can do to improve your next shutdown is start the planning process earlier and involve the right people from the beginning. The network doesn’t just sequence the work — it forces every area owner, supervisor, and contractor to think through how the work will actually be done. That process alone surfaces problems that would otherwise surface in the field, at the worst possible time.
Shutdown execution
Planning sets the stage. Execution is where the network earns its keep. During the shutdown, conditions change constantly — scope expands, parts are delayed, contractors encounter unexpected conditions, and field decisions get made under pressure. The network gives your management team real-time visibility into every one of those changes and their consequences.
Our on-site execution support includes:
Daily network updates incorporating all field changes and new information
Critical Path monitoring — immediate visibility when the path shifts
Daily supervisor update sheets — every supervisor knows their priority tasks, sub-critical tasks, and float
What-if scenario analysis so management can make informed decisions before committing resources
Change order tracking in real time — no surprises at invoice time
Management reporting at every level — from shift supervisors to VP
Crane, equipment, and resource coordination to minimize idle time and maximize efficiency
When your shutdown encounters a crisis — and every shutdown does — the question is whether the crisis manages you, or you manage the crisis. A properly maintained network gives your team the information they need to respond deliberately instead of reactively.
Training & Certification
Training is how the methodology becomes a lasting capability rather than a one-time engagement. Through our partnership with the Gary Dobson Training and Coaching Center, we offer two proven courses developed over 30 years of real-world shutdown planning experience.
Understanding Critical Path Networks for the Shutdown Management Team
Designed for plant personnel who support the shutdown but may not be directly involved in planning. This course builds the foundational understanding that allows your entire team — safety managers, purchasing managers, production supervisors, maintenance mechanics, electricians, and process engineers — to actively participate in shutdown preparation and execution rather than simply reacting to it.
Participants learn the principles of Critical Path Planning, how to read and interpret a Critical Path Network, and how their role connects to the overall shutdown plan. When your whole team understands the methodology, coordination improves and communication breakdowns — one of the leading causes of shutdown delays — are dramatically reduced.

Critical Path Networks for Major Maintenance Shutdowns
This is the foundational certification course for planning and scheduling professionals. It is the first in a development program that builds the skills, tools, and thinking process required to construct and manage a full Critical Path Network for a major maintenance shutdown.
Participants learn how to deconstruct work scope into network activities, establish logical sequence and dependencies, build the network in MS Project®, calculate the Critical Path, level resources, and manage the network through execution. Course graduates leave with a certification and the practical skills to immediately contribute to their next shutdown planning cycle.
Designed for: Plant Managers, Assistant Plant Managers, Production and Maintenance Superintendents, Maintenance Planners, Project Engineers, Reliability Engineers, and all personnel directly responsible for shutdown planning and execution.

Custom Training Program
Custom training programs are available for organizations with specific operational requirements or scheduling constraints. Contact us to discuss a curriculum tailored to the specific needs of your team and facility.
Multi-Site Implementation
For organizations managing shutdowns across multiple facilities, the real opportunity isn’t improving one shutdown — it’s building a consistent, high-performing planning capability across your entire portfolio.
A single VP-level decision to implement Critical Path Methodology organization-wide can transform how every plant in your portfolio approaches planning and shutdown management. We work with corporate leadership to develop a structured rollout that includes:
Assessment of current planning maturity at each facility
Phased training rollout — certification courses for planners, overview courses for management teams
On-site mentoring through one or more live shutdown cycles at each facility
Development of standardized templates and planning tools tailored to your operations
Remote coordination support using web-based planning tools to monitor preparation progress across sites
Year-over-year improvement tracking and post-shutdown analysis
One client relationship. Multiple plants. Compounding results year over year. This is the engagement model that delivers the greatest long-term value — for your organization and for ours.
Additional Capabilities
Reliability Centered Maintenance (RCM)
A structured approach to developing the right maintenance strategy for each asset — moving your organization from reactive maintenance toward a predictive, reliability-focused program. Includes operating context development, Failure Mode & Effects Analysis (FMEA), and predictive maintenance program implementation.
Root Cause Analysis
Certified in Apollo Root Cause Analysis, James helps your team identify the true cause of equipment failures and develop corrective actions that prevent recurrence — not just treat symptoms.
GET IN TOUCH
Ready to Engineer Your Next Shutdown?
Let’s evaluate your upcoming scope and determine the precise timeline and resources your physical work actually demands.